《2007-2008年中国水电行业调查与投资前景预测报告(英文版)》简介:
In 2006, the gross generated energy in China has reached 2755.7 billion KWH, which has increased by 13.67% as compared with 2005, while the generated energy of hydropower has reached 378.3 billion KWH, which has increased by 3.50% as compared with the same period last year. The proportion of hydropower in the gross generated energy was 13.7% in 2006, which has dropped by 1.5% than 2005. The pace of construction of hydropower station is evidently behind with the average progress of power construction all over the country. The total amount of new generating sets put into service in 2006 was 101,170 MW, which has exceeded the generally prospected amount of 90,000 MW. The gross installed generating capacity at the end of 2006 has reached 622,000 MW that has increased by 20.3% as compared with the same period of last year, which has hit an all-time high in the annual growth. As for the composition of power source, the percentage of thermal power was 77.8 % that has increased by 2.1 percentage points; the percentage of hydropower was 20.7 %, which has dropped by 2.0 percentage points, and this was the result of pursuing the improvement of supply capability steadily and fast in a short time under the condition of electric power shortage. The average exploitation level of hydropower in developed countries is above 60%. Among the countries, the percentage of exploited hydroelectric resource is about 82% in the USA, 84% in Japan and 65% in Canada. Comparing with these countries, the hydroelectric development in our country is still at a comparatively low level, and still has great development potential.
At present, the installed generation capacity of hydropower all over the world is about 800 million KW, which meets 20% of the global electricity requirement. The development and utilization of hydro energy resource has made significant contributions for the human civilization and social progress. China is relatively rich in Hydro energy resource, of which the installed generation capacity available for exploitation exceeds 400 million KW, and the annual energy output is more than 1700 billion KWH, so hydro energy resource is an important energy resource in China. The potential hydropower resource in our country comes first in the world. In accordance with the re-check result of hydropower resource in 2003, the amount of rivers of which the potential hydro energy is above 1,000 KW was 33,886 in our country (mainland). The theoretical potential hydropower resource was 6080 billion KWH of annual quantity of electricity with an average power of 694 million KW, which makes up about 1/6 of the quantity of electricity all over the world. The 542 million KW of technical development capacity available has made up 78.1% of the average power, and the 2470 billion KWH of annual energy output has made up 40.6 % of theoretical potential quantity of electricity. Therefore, the development of hydropower industry in our country has a great geographical advantage.
Emphasize on the exploitation of resources in the west part of China. According to the relevant information, the amount of hydropower resource available for development and utilization in our country can reach 37.8 billion KW, which come first in the world. Southwest China is very rich in hydropower resource, and 68% of the total amount of hydropower resource available for exploitation concentrates in this region, of which the ratio of resource developed and used is less than 10% now. The exploitation of hydropower resource in the southwest may promote the development of the relevant industries of communication, cement, steel product, electromechanical etc. The positive and steady implementation of the plan of "Transport the Electricity from the West to the East" may optimize the power utilization structure in the East and improve the regional ecological environment, while offering the electricity required by the development of the East.
In accordance with the preliminary planning, by the year of 2020, the amount of installed generation capacity of hydropower all over the country will reach 270 million KW, which accounts for 29% of the installed gross capacity of electric power, and the hydroelectric development level will reach 68%. The the direct benefit of power generation is equivalent to the saving of 420 million ton of standard coal equivalent. The reduction is 1.17 billion ton of CO2, 7.5 million ton of sulfur dioxide and other kinds of harmful gas. It will play an important role in the reduction of global air pollution and greenhouse effect and makes great environmental benefit. Hydropower construction may also take account of the comprehensive benefit of flood prevention, irrigation and transportation etc, and at the same time, it also will make the social benefit of the promotion of economic growth and social development, and the poverty alleviation. Therefore, the hydropower industry has a great long-term potential and is favored by lots of investment institutions. |
 |
报告目录 |
|
《2007-2008年中国水电行业调查与投资前景预测报告(英文版)》目录:
Chapter 1 Situation of China Hydropower Resources
Section 1 General Situation of China Hydro-energy Resources
I. Reserves and Distribution of China’s Hydro-energy resources
II. Characteristics of China’s Hydro-energy resources
Section 2 Utilization Status of China’s Hydro-energy Resources
I. General Application
II. Twelve Hydropower Bases
III. Hot spot Area Analysis on Current China’s Hydropower Resources Development
IV. The principal problems
Chapter 2 Hydro-energy Resources and Application of China’s Main Rivers
Section 1 Changjiang River Basin
I. General Situation
II. Analysis on upper hydro-energy resource and development
III. Analysis on middle hydro-energy resource and development
Section 2 Rivers in Southwest
I. Analysis on hydro-energy resource and utilization of Nujiang River
II. Analysis on Hydro-energy Resource and Utilization Lancangjiang River
III. Analysis on hydro-energy resource and utilization of Dulong River
IV. Analysis on hydro-energy resource and utilization of Yarlung Zangbo River
Section 3 Yellow River Basin
I. General Situation
II. Analysis on hydro-energy resource and development of Yellow River upstream
III. Main Problems and Measure during the development of hydro-power in the upstream of Yellow River
IV. Analysis on hydro-energy resource and development of middle stream of Yellow River
V. Hydropower Development Plan of Yellow River upper and middle stream
VI. Forecast of Develoment of Yellow River Hydropower
Section 4 Pearl River Basin
I. General Situation
II. Analysis on hydro-energy resource and development of main branches of Pearl River
III. Hydropower Development Plan
Section 5 Rivers along Southeast Coast
I. General Situation
II. Analysis on hydro-energy resource and development of Main Branches
Section 6 Development and Utilization of Hailuan River Hydro-energy Resources
Section 7 Development and Utilization of Huai River Basin Hydro-energy Resources
Section 8 Rivers in Northeast China
I.Analysis on hydropower resource and development of Heilongjiang river system
II. Analysis on hydropower resource and development of Tumen River system
III. Analysis on hydropower resource and development of Yalu river system
IV. Analysis on hydropower resource and development of Liaohe river system
Chapter 3 Status and Trend of Global Hydropower Industry
Section 1 Distribution and Utilization of Global Hydropower Resources
I. General Development
II. Europe
III. North America
IV. Asia
Section 2 Analysis on Global Hydropower Development
Section 3 Successful Experience and Revelation of Gloabal Hydropower Industry
Section 4 Main Problems in the Development of Global Hydropower Industry
Section 5 Forecast of Development Trend of Global Hydropower Industry
Chapter 4 Analysis on Development Environment of China’s Hydropower Industry during 2007-2008
Section 1 Influence of Power Industry Policy on its Development
I. Development Plan of Power Industry during the period of”Eleventh Five-year Plan”
II. Analysis on the development of hydropower industry affected by”Transport the Electricity from the West to the East” strategy
III. Analysis on financing and investment in hydropower industry.
IV. Analysis on Tax policy of hydropower Industry
V. Change of foreign investment policy on hydropower in post-WTO 70
VI. Forecast on key development areas and restructure of hydropower 71
Section 2 Influence of Environment Protection Policy on the Development of Hydropower Industry
I. Influence of United Nations Framework Convention on Climate Change on the hydropower development
II. The influence of Law of Environmental Impact Assessment on hydropower development in our country
III. The influence of Environmental Protection Act of Construction Item to Hydropower development
Section 3 Influence of River Water on the Development of Hydropower Power Industry
I. The Analysis on the stability of hydrologic records of main rivers in China
II. Main ways to maintain the stability of hydropower water supply
Chapter 5 Analysis and Research on Policies and System Refomr of Hydropower Industry
Section 1 Relevant Industry Policy for the Development of Hydropower
I. Transmission from active development to orderly development
II. Analysis on the draft plan of China's power during the period of "Eleventh Five-year Plan"
III. " Notice on accelerating the restructuring of the electric power industry, promote the healthy and orderly development”
IV. Implementation of "renewable energy Law”
V. Power planning throughout China
Section 2 Analysis on Electric Power System Reform
I. System reform policy of China's electric power
II. Electric power system reform of foreign countries as reference
Section 3 Outlook of China's Hydropower Industry-Related Policy duiring 2007-2008
Chapter 6 Analysis on the Overall Operation of China's Hydropower Industry in 2006
Section 1 Analysis on Overall China's Hydropower Industry
Section 2 Status of Hydropower in China’s Energy System
Section 3 Characteristics of China's Hydropower Industry
I. Big investment, long period of construction
II. Long-term benefits, and the short-term poor benefits, slow recovery of funds
III. Natural and seasonal influence
IV. Uneven distribution of water and electricity, more in the west, less in the east
Section 4 Main Problems of China's Hydropower Industry
I. Slow process of hydropower industry
II. Grid construction is lagging behind, restricting the development of domestic hydroelectric industries
III. The formation of price control mechanism restricts development of hydropower industry
Chapter 7 Analysis on Production Ability of China’s Hydropower Industry during 2007-2008
Section 1 Analysis on Production of Hydropower Industry in 2006
Section 2 Analysis on Installed Capacity of China’s Hydropower Changes during 2007-2008
Section 3 Analysis on the Changes of China Hydropower Generation during 2007-2008
Section 4 Analysis on Hydropower Production during 2007-2008
I. Index of General Economic Operation
II. Analysis on Hydropower Production in Different Area
III. Analysis on different ownership enterprises
IV. Annalysis on enterprises with different scale
Section 5 Main Problems in Hydropower Generation in China
Chapter 8 Forecast and Analysis on Supply and Demand in China’s Hydropower Market during 2007-2008
Section 1 Forecast and Analysis on Market Demand in China’s Hydropower Market during 2007-2008
I. Analysis on development trend of power consumption
II. Analysis on China’s power demand
Section 2 Forecast and Analysis on Non-water Electric Power in China during 2007-2008
I. Analysis on thermal power supply
II. Analysis on nuclear power supply
III. Analysis and Forecast of Wind Power Supply
IV. Analysis and Forecast of Gas power supply
V. Analysis on thermal power, nuclear power, wind power and gas power generation projects
VI. Analysis on supply and demand of Non-hydropower
Section 3 Forecasts of China's Demand for Hydropower Market during 2007-2008
Chapter 9 Analysis on Sales Channel and Marketing Modes of China's Hydropower during 2007-2008
Section 1 Analysis on Sales Channels of Current Hydropower
Section 2 Comparative Analysis on Advantages and Disadvantages of Major Client’s Direct Electricity and Bidding
Section 3 Relations between Differentiated Pricing and Bidding
I. Grid price difference between Hydropower and thermal power
II. Price difference among the hydro-electricity in different regions
Section 4 Analysis on Trading Patterns of Different Types of Hydropower
I.Hydropower station with Comprehensive Utilization mainly and balance generating
II. Stations integrating power generation, flood control, shipping
III. Runoff - Hydropower Station
IV. Hydropower stations with regulatory functions over the quarter
V. Cascade Hydropower
Section 5 Analysis on Diversification Trend of Hydropower Sales
Section 6 Discussion on the Hydropower onto-grid Discrimination
I.Status of private Grid utilities and foreign enterprises
II. China's hydropower Grid policies
III. The main problems of Chinese private and foreign investment in hydropower Grid
IV. Whether discrimination exists in Grid
Chapter 10 Analysis on China’s Hydropower onto-grid Price Competition during 2007-2008
Section 1 Analysis on China’s Electricity Price reform
Section 2 Analysis on China's Power Bidding Status
Section 3 Comparision of Costs among Main Power Sources in China
I. Cost of Thermal Power
II. Generation Cost of Hydropower
III. Generation Cost of Nuclear Power
IV. Generation Cost of Wind Power
V. Generation Cost of Solar Power 146
Section 4 Competitive Advantage of China's Hydropower Onto-grid Prices
Section 5 Development Trend of China's Hydropower Bidding
Chapter 11 Forecast of China’s Hydropower Equipment Industry during 2007-2008
Section 1 Analysis on Hydropower Equipment Market
I. Analysis on electrical equipment production growth
II. Production of power generating equipment
Section 2 Development Opportunities of Hydropower Equipment Market
I. Forecast of Demand for Generating Equipment at home and abroad
II. Grid planning
Section 3 Forecast and Trend of Hydropower Equipment Industry
Chapter 12 Analysis on China Constructing and Planning Hydropower Projects Scale during 2007-2008
Section 1 Scale of China's Hydropower
Section 2 Proposed Scale of China's Hydropower during 2007-2008
Section 3 Analysis on Installed Capacity of China’s Hydropower during 2007-2008
Chapter 13 Forecast and Analysis on the Competition in China's Hydropower Industry during 2007-2008
Section 1 Overall Pattern of Competition among China Hydropower Industry
I. Original "five power companies" further strengthen hydropower
II. Huge State-owned Enterprises have brought an enormous amount of money into the electricity
III. Central Electricity Generation’s merger with local hydropower enterprises have become the trend
IV. Hydropower Development accelerates
Section 2 Analysis on Competitive Groups in China’s Hydropower Industry
I. Classification of Competitive Groups in China’s Hydropower Industry
II. SWOT 171
Section 3 Forecast of Competition in China's Hydropower Industry
I. Inevitable inter-regional expansion of large enterprises generating
II.Low-cost advantages of hydropower is gradually emerging
IV. SHP investment prospect
V. Foreign and private capital enter the hydropower sector investment
VI. Integrated energy companies will become the trend within the next decade
Chapter 14 Analysis on Regional Development of China's Hydropower Industry during 2007-2008
Section 1 Analysis on Sichuan Hydropower Development
I. Water resource and development of Sichuan
II. Sichuan hydropower development and investment policy
III. Sichuan Constructing and Planning Hydropower Projects
IV. Sichuan main rivers with much developed value
V. Sichuanhydropower industry development trend
Section 2 Analysis on Hydropower Development in Yunnan
I. Yunnan water resources and development situation
II. Yunnan hydropower development and investment policy
III. Yunnan Constructing and Planning Hydropower Projects
IV. Yunnan main rivers with much developed value
V. Yunnan hydropower industry development trend
Section 3 Analysis on Guizhou Hydropower Development
I. Guizhou water resources and development situation
II. Guizhou Constructing and Planning Hydropower Projects
III. Guizhou main rivers with much developed value
IV. Development trend of Guizhou hydropower industry
Section 4 Analysis on Guangxi Hydropower Development
I. Guangxi water resources and development situation
II. Guangxi hydropower development and investment policy
III. Guangxi Constructing and Planning Hydropower Projects
IV. Main rivers with much developed value in Guangxi
1. Xijiang river system
Section 5 Analysis on Hubei Hydropower Development
I. Hubei water resources and development situation
II. Hubei hydropower development and investment policy
III. Hubei main rivers with much developed value
IV. Hubei Constructing and Planning Hydropower Projects
V. Development trend of Hydropower industry in Hubei
Section 6 Analysis on Hunan Hydropower Development
I. Hunan water resources and development situation
II. Hunan hydropower development and investment policy
III. Hunan main rivers with much developed value
IV. Hunan Constructing and Planning Hydropower Projects
V. Onto-grid and common measure of Hunan Hydropower
VI. Hunan hydropower industry development trend
Chapter 15 Operation of Key Listing Companies of Hydropower Industry
Section 1 China Yangtze Power Co., Ltd
I. Basic Situation
II. Business Situation in Recent Three Years
III. Plant Distribution and Power Resource Structure
IV. Analysis on Constructing and Planning Projects during 2007-2008
V. Development Plan during the Period of”Eleventh Five-year Plan”
VI. Business Diversification
Section 2 Chongqing Three Gorges Electric Power Co., Ltd
I. Basic Situation
II. Business Situation in Recent Three Years
III. Plant Distribution and Power Resource Structure
IV. Analysis on Constructing and Planning Projects during 2007-2008
V. Development Plan during the Period of”Eleventh Five-year Plan”
VI. Business Diversification
Section 3 Leshan Electric Power Co., Ltd
I. Basic Situation
II. Business Situation in Recent Three Years
III. Plant Distribution and Power Resource Structure
IV. Analysis on Constructing and Planning Projects during 2007-2008
V. Development Plan during the Period of”Eleventh Five-year Plan”
VI. Business Diversification
Section 4 Guangxi Guidong Electric Power Co., Ltd
I. Basic Situation
II. Business Situation in Recent Three Years
III. Plant Distribution and Power Resource Structure
IV. Analysis on Constructing and Planning Projects during 2007-2008
V. Development Plan during the Period of”Eleventh Five-year Plan”
VI. Business Diversification 235
Section 5 Fujian MingDong Electric Power Co.,Ltd
I. Basic Situation
II. Business Situation in Recent Three Years
III. Plant Distribution and Power Resource Structure
IV. Analysis on Constructing and Planning Projects during 2007-2008
V. Development Plan during the Period of”Eleventh Five-year Plan”
VI. Business Diversification
Section 6 Qianjiang Water Resources Development Co., Ltd
I. Basic Situation
II. Business Situation in Recent Three Years
III. Plant Distribution and Power Resource Structure
IV. Analysis on Constructing and Planning Projects during 2007-2008
V. Development Plan during the Period of”Eleventh Five-year Plan”
VI. Business Diversification
Section 7 Sichuan Xichang Electric Power Co. Ltd
I. Basic Situation
II. Business Situation in Recent Three Years
III. Plant Distribution and Power Resource Structure
IV. Analysis on Constructing and Planning Projects during 2007-2008
V. Development Plan during the Period of”Eleventh Five-year Plan”
VI. Business Diversification
Section 8 SiChuan Ming Xing Electric Power Co.,Ltd
I. Basic Situation
II. Business Situation in Recent Three Years
III. Plant Distribution and Power Resource Structure
IV. Analysis on Constructing and Planning Projects during 2007-2008
V. Development Plan during the Period of”Eleventh Five-year Plan”
VI. Business Diversification
Section 9 Guangxi Guiguan Electric Power Co.,Ltd
I. Basic Situation
II. Business Situation in Recent Three Years
III. Plant Distribution and Power Resource Structure
IV. Analysis on Constructing and Planning Projects during 2007-2008
V. Development Plan during the Period of”Eleventh Five-year Plan”
VI. Business Diversification 258
Section 10 Guizhou Qianyuan Power Co., Ltd
I. Basic Situation 259
II. Business Situation in Recent Three Years
III. Plant Distribution and Power Resource Structure
IV. Analysis on Constructing and Planning Projects during 2007-2008
V. Development Plan during the Period of”Eleventh Five-year Plan”
VI. Business Diversification
Chapter 16 Analysis on Price Competition for Hydropower in Power Market
Section 1 Analysis on Hydropower in Competitive Market
Section 2 Participants of Hydropower in the Market adhere to the Principle
Section 3 Coordination between Quotation Subject and Successful Bid Quantity
I. Quotation of Cascade Station the main way
II. Coordination of hydropower stations in the competitive market
Section 4 Treatment of Consumption Deviation Resulting from Inaccuracies in Hydrological Forecast
I.Ideas for handling consumption deviation resulting from inaccuracies in hydrological forecast
II. Treatment of waste water due to unsuccessful bidding in hydropower market
Chapter 17 Prospect and Forecast of China’s Hydropower Industry during 2007-2008
Section 1 Forecast of Economic Circle of Power Industry
Section 2 Forecast of Hydropower Installed Capacity
I. By 2015, hydropower Installed Capacity in China will reach 150 million KW
II. By 2020, China hydropower Installed Capacity will reach 250 million KW
Section 3 Prediction of Current Power Structure
Section 4 Prediction and Analysis on China's Water Development
Chapter 18 Investment Risk and Suggestion of China’s Hydropower Industry during 2007-2008
Section 1 Analysis on Cost and Benefit of China’s Hydropower Industry
I. Cost Analysis
II. Benefit Analysis
Section 2 Analysis on Investment Opportunity and Risk
I. Regional Limits and Policy Risk of Small Hydroelectric Projects
II. Risk of Hydropower’s dependence on rainfall and other natural conditions
III. Risk of environmental restrictions
IV. Risk of the changes in Power supply and demand in the market
Section 3 Analysis on Regional Investment
I. Changjiang River upstream
II. All rivers in southwest China
III. Yellow River Upper Reaches
Section 4 Investment Strategies
Table of Chart
Chart 1 Reserves and Distribution of China’s Hydro-energy resources
Chart 2 Developable Hydro-energy resources in China
Chart 3 Twelve Hydropower Bases
Chart 4 Twelve Hydropower Bases in China
Chart 5 Depth of Main Rivers in Southeast Coast
Chart 6 Distribution and Utilization of Global Water Resources
Chart 7 Developable Energy in Technology in some countries
Chart 8 Dam and Hydropower in some countries in 2005
Chart 9 Number of Global Dams
Chart 10 Main Technological Parameters of Global Hydropower Development in 2005
Chart 11 Number and Loss of Enterprises above the scale during February-December, 2006
Chart 12 Product of China’s Hydropower Industry during February-December, 2006
Chart 13 Product Increasing trend during February-December, 2006
Chart 14 Changes of Installed Capacity for years
Chart 15 Comparsion between Hydropower and Thermal Power during January-October, 2006 (Unit: 0.1 billion KWH)
Chart 16 Hydro Power Generation and Increase Trend for months during 2004-2006
Chart 17 Accumulative Increase of Hydro Power Generation for month during 2004-2006
Chart 18 Assets and Liabilities of Hydropower Industry during February-December, 2006 Unit: Thousand Yuan
Chart 19 Cost and Expense of China’s Hydropower Industry during February-December, 2006 Unit: Thousand Yuan
Chart 20 Profit making of Hydropower Industry during February-December, 2006 Unit: Thousand Yuan
Chart 21 Main Economic Index of Hydropower Industry during February-December, 2006 Unit: Thousand Yuan
Chart 22 Number of enterprises above the scale and their Loss of Hydropower Industry in Different Area in 2006
Chart 23 Liabilities of Hydropower Industry in Different Area in 2006 Unit: Thousand Yuan
Chart 24 Profit making of Hydropower Industry in different area in 2006 Unit: Thousand Yuan
Chart 25 Number of enterprises above the scale and their Loss of Hydropower Industry in Different ownership in 2006
Chart 26 Assets and Liabilities of different ownership enterprises of hydropower industry in 2006
Chart 27 Profit making situation of enterprises with different ownership in hydropower industry in 2006
Chart 28 Nuumber of enterprises above the scale and loss in hydropower industry in 2006 Unit: Thousand Yuan
Chart 29 Liabilities of enterprises with different scale in hydropower industry in 2006 Unit: Thousand Yuan
Chart 30 Profit-making situation of enterprises with different scale in hydropower industry in 2006 Unit: Thousand Yuan
Chart 31 Forecast on the power comsumption in China during 2002-2008
Chart 32 Status of 2006 China’s Thermal Power Industry (Unit: Thousand Yuan)
Chart 33 Project of Yueyang Nuclear Power Station
Chart 34 Accumulative generation and increase in the months during 2004-2006
Chart 35 Supply Structure of China’s Power in 2006
Chart 36 Cost of Thermal Power
Chart 37 Cost of Thermal power
Chart 38 Generation Cost of Hydropower
Chart 39 Generation Cost of Nuclear Power
Chart 40 Generation Cost of Wind Power
Chart 41 Cost of Wind Power
Chart 42 Decreasing Generation Cost of Wind Power Unit:euro cent/KWH
Chart 43 Generation Cost of Solar Power
Chart 44 Sales Revenue Increase of Transmission and Transformation Equipment in 2006
Chart 45 Forecast on Increase of Installed Capacity and Generation equipment duringEleventh Five-year Plan
Chart 46 Annual Changes of Hydropower Installed Capacity
Chart 47 Comparisions between the five generation groups in 2005
Chart 48 Sichuan water resources distribution
Chart 49 Analysis on market for Sichuan Power transferring to coastal provinces (ten thousand KW)
Chart 50 Constructing and Planing Pojects in Sichuan
Chart 51 Hydropower Development of Main Rivers in Sichuan
Chart 52 Constructing and Planning Projects in Yunnan
Chart 53 Guizhou Constructing and Planning Hydropower Projects
Chart 54 Guangxi Constructing and Planning Hydropower Projects
Chart 55 Hubei Constructing and Planning Hydropower Projects
Chart 56 Hunan Constructing and Planning Hydropower Projects
Chart 57 Assets of China Yangtze Power Co., Ltd in 2006
Chart 58 Profit of China Yangtze Power Co., Ltd in 2006
Chart 59 Generation Power of Three Gorges Station and Gezhouba Station in 2006
Chart 60 Business Status of Chongqing Three Gorges Water Conservancy and. Electric Power Co.,Ltd in 2006
Chart 61 Business status of Chongqing Three Gorges Water Conservancy and. Electric Power Co.,Ltd in 2006
Chart 62 Business Status of Leshan Electric Power Co., Ltd in 2006
Chart 63 Business Structure of Leshan Electric Power Co., Ltd in 2006
Chart 64 Operating Status of Guangxi Guidong Electric Power Co., Ltd in 2006
Chart 65 Business Structure of Guangxi Guidong Electric Power Co.,Ltd in 2006
Chart 66 Business Status of Fujian MingDong Electric Power Co.,Ltd in 2006
Chart 67 Business Structure of Fujian MingDong Electric Power Co.,Ltd in 2006
Chart 68 Operating Status of Qianjiang Water Resources Development Co.,Ltd in 2006
Chart 69 Business Status of Sichuan Xichang Electric Power Co. Ltd during January-September, 2006
Chart 70 Business Status of SiChuan Ming Xing Electric Power Co.,Ltd in 2006
Chart 71 Business Structure of SiChuan Ming Xing Electric Power Co.,Ltd during January-September, 2006
Chart 72 Business Status of Guangxi Guiguan Electric Power Co.,Ltd in 2006
Chart 73 Business Structure of Guangxi Guiguan Electric Power Co.,Ltd during January-September, 2006 Unit: Yuan
Chart 74 Business status of Guizhou Qianyuan Power Co.,Ltd in 2006
Chart 75 Forecast of power source structure in the world during 1999-2020 Unit:1015Btu
Chart 76 Increasing Trend of Cost and Expense of China’s Hydropower Industry in 2006 (1)
Chart 77 Increasing Trend of Cost and Expense of China’s Hydropower Industry in 2006 (2)
Chart 78 Cost and Expense Contrast of Small, Middle and Large Size Enterprises of China’s Hydropower Industry
Chart 79 Main Economic Index of Hydropower Industry in 2006
|
| |
【返回】 【关闭】 |
|
|
|
 |
报告销售热线:
8610-58626531
8610-58626532
报告客服中心:
13391926255
报告绿色通道:
13371712227
VIP MSN: 点击可直接咨询
汇款信息:
公司名称:北京智道顾问有限责任公司
开户银行:中国农业银行北京市东城区支行奥园分理处
帐 号:191501040001493
|
|
 |
|